Purpose

To conduct work in a safe manner and to wear appropriate PPE i.e. safety glasses

Induct support staff to Emergency Management e.g. Emergency Evacuation

 

Applies to

All Windward Industries staff and employees working on WLW premises

 

Training

 

Staff to train/support employees on task

 

Staff to ensure all employees are familiar with evacuation areas.

 

Staff to ensure employees are supervised all times and do NOT proceed beyond enclosed work area in shed. Supervision is required to ensure due process.

 

Safety

      Employees do NOT proceed beyond enclosed work area in shed.  PPE: 3M mask, Racal helmet and protective gloves

      Be aware of other operational traffic around you and maintain a 4mt distance

      WI staff/employees are to follow the directions of personal in case of Emergency Evacuations or practice drills

      All employees be familiar with evacuation point

 

Pre-Operational Checks

Rubber matt on floor does not present a trip hazard.

Check that temperature setting on heat sealer is not set to high. Maximum setting: Setting 4

 

Hazard Assessment

List here all aspects of the job e.g. Manual handling, Chemical hazards

      Minimize manual handling of blue drums.

      Check for liquid spills

      Items left by other contractors

 

Environmental Impact

House keeping: Clean workstation every time before leaving site. This will prevent build up of Polsol on floor and work benches.

 

Isolation

List any “standing isolation procedures by title and number

Not Applicable

 

Related Documents

Task Analysis on processing Polsol

Job Safety Analysis

 

Detailed Procedure

Brief numbered steps of job task. Include flow chart where required:

1.       Brief employees on work/emergency evacuation procedure

2.       Check for trip hazard and heat setting on sealing unit

3.       Staff to supervise set up procedure. Give verbal clues

4.       House keeping: Clean workstation/floor every time before leaving site.

5.       Notify WLW personal with regards to any potential hazards or EOHS matters as observed