Woodbox Induction & Safety Procedure

Health & Safety > Woodbox Induction & Safety Procedure

Authorised by Chief Executive Officer

Revised Date: 1 March 2017

 

All users of equipment in the Woodbox facility first need training of the Safe Operational Procedures of all static machinery. Users of the Woodbox are responsible to maintaining the facility as a safe and workable environment. This includes:

 

      Reporting hazards and areas/equipment in need of maintenance

      Cleaning up after use

      Emptying dust extraction bags when they are full

      Keeping floors and walk ways clear of obstructions

      Locking up facility after use

 

Induction is the responsibility of the Windward Manager as the Woodbox Facility comes under the Windward Portfolio.

 

Woodbox Training Induction Checklist HRF-50

 

Equipment Procedure

 

All large scale static machinery and tools in the Woodbox facility have safe operating procedures that are to be followed when using the equipment. These are listed as follows:

 

Safe Work Procedure for Air Compressor

Safe Work Procedure for Bench/Pedestal Grinder

Safe Work Procedure for Disc Sander

Safe Work Procedure for Drill Press

Safe Work Procedure for Drop Saw

Safe Work Procedure for Radial Arm Saw

Safe Work Procedure for Router

Safe Work Procedure for Surface Planer or Jointer

Safe Work Procedure for Table Saw

Safe Work Procedure for Thicknesser